Difference between revisions of "CEQA Glossary"
From CCoWS Wiki
Line 3: | Line 3: | ||
==Definitions== | ==Definitions== | ||
*Definitions | *Definitions | ||
− | **'''Alternatives:''' CEQA requires an EIR to examine a “reasonable range” of alternatives to the project or its location. These must include the | + | **'''Alternatives:''' CEQA requires an EIR to examine a “reasonable range” of alternatives to the project or its location. These must include the “no project” alternative. Alternatives must be feasible, meet most |
− | “no project” alternative. Alternatives must be feasible, meet most | + | |
of the project objectives, | of the project objectives, | ||
− | + | '''Initial Study:''' A systematic review of a proposed project undertaken to determine whether there is substantial evidence that it may result in one or more significant impacts. | |
==References== | ==References== |
Revision as of 16:01, 4 April 2013
This page is a glossary of useful terms as defined by CEQA policy
Contents
Definitions
- Definitions
- Alternatives: CEQA requires an EIR to examine a “reasonable range” of alternatives to the project or its location. These must include the “no project” alternative. Alternatives must be feasible, meet most
of the project objectives, Initial Study: A systematic review of a proposed project undertaken to determine whether there is substantial evidence that it may result in one or more significant impacts.