CEQA review and land use planning
From CCoWS Wiki
Projects which are consistent with the development density established by existing zoning, community plan, and or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary for project specific effects peculiar to the project or site. If the project includes specific effects additional to those already considered under the plan EIR, the scope of the review will be limited to the additional effects. [1] [2]
Cite error: <ref>
tags exist, but no <references/>
tag was found