Difference between revisions of "CEQA review and land use planning"

From CCoWS Wiki
Jump to: navigation, search
(New page: Projects which are consistent with the development density established by existing zoning, community plan, and or general plan policies for which an EIR was certified shall not require add...)
 
Line 1: Line 1:
Projects which are consistent with the development density established by existing zoning, community plan, and or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary for project specific effects peculiar to the project or site.  <ref> Remy et al. 1996. Guide to the California Environmental Quality Act. </ref>
+
Projects which are consistent with the development density established by existing zoning, community plan, and or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary for project specific effects peculiar to the project or site.  <ref> Remy et al. 1996. Guide to the California Environmental Quality Act. </ref> <ref>[http://www.sccoplanning.com/LinkClick.aspx?fileticket=p-c2euotaVY%3D&tabid=983]</ref>

Revision as of 19:37, 2 April 2013

Projects which are consistent with the development density established by existing zoning, community plan, and or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary for project specific effects peculiar to the project or site. [1] [2]
Cite error: <ref> tags exist, but no <references/> tag was found