Difference between revisions of "ENVS 560/L Watershed Systems - Working"
From CCoWS Wiki
Line 20: | Line 20: | ||
== Carmel WS Basin Complex Burn Severity Estimations == | == Carmel WS Basin Complex Burn Severity Estimations == | ||
− | Severity Area Km2 | + | {|Severity |Area Km2|- |
|Unburned / Very Low 42 | |Unburned / Very Low 42 | ||
|Low 24 | |Low 24 |
Revision as of 13:01, 8 March 2009
This page is a working area for the ENVS 560 class.
Contents
HEC-HMS
Carmel MPWMD flow data import
- CA = Cachuagua Creek = Fred
- CL = San Clemente Creek = Cooper
- DJ = Carmel R at Don Juan Bridge = Fred
- GA = Las Garzas Creek = Pam
- H1 = Carmel R at Highway 1 = Violetta
- HI = Hitchcock Cyn = Arnett
- PI = Pine Creek = Erin
- PO = Potrero Creek = Steve
- RC = Robinson Canyon = Randy
- TU = Tularcitos Creek = Bart
Carmel WS Basin Complex Burn Severity Estimations
Unburned / Very Low 42 | Low 24 | Moderate 48 | High 15 | Total 129
This data was taken from the BAER UTM Zone 10N, NAD83 shapefile an image of which is available: 2008 Burn Severity. Please check with your data and update as necessary. Old stuff below hereCarmel Watershed Mapping Project: Creating Maps of the Carmel River WatershedAs you create drafts, post them here. Posting images is a two stage process:
Wishlist of mapsAdd your name in bold after a map to claim it as yours. (* denotes easier; ** denotes medium; *** denotes harder)
Subwatersheds
|