Difference between revisions of "ENVS 560/L Watershed Systems - Working"

From CCoWS Wiki
Jump to: navigation, search
(Links to what you mostly worked on (2015) and a very brief summary of what you did)
(Links to what you mostly worked on (2015) and a very brief summary of what you did)
Line 86: Line 86:
 
*** Edited [[Regional Water Project]], edited [[Regional Urban Water Augmentation Project (RUWAP)]]
 
*** Edited [[Regional Water Project]], edited [[Regional Urban Water Augmentation Project (RUWAP)]]
 
*** Updated this list of [[CEQA projects on the Central Coast]] with links to recent project pages that already exist on the wiki (like [[MPWSP]] etc.))
 
*** Updated this list of [[CEQA projects on the Central Coast]] with links to recent project pages that already exist on the wiki (like [[MPWSP]] etc.))
*** Added links to specific project summary pages on CEQAnet from the individual CEQA project pages on the wiki, using the example I created on the [[MPWSP]] page where it says "SCH#" (look inside the link to see how it uses a "ProjectKey" that you can get fro the URL that CEQAnet gives you when you do a search)
+
*** Added links to specific project summary pages on CEQAnet from the individual CEQA project pages on the wiki, using the example I created on the [[MPWSP]] page where it says "SCH#" (look inside the link to see how it uses a "ProjectKey" that you can get fro the URL that CEQAnet gives you when you do a search), added links in text to CEQAnet project pages where EIR or CEQA documents were mentioned
 
*** In the "Links" sections at the bottoms of each of the main CEQA "Project" pages, added a link to the list of [[CEQA projects on the Central Coast]] (if one was not already there)
 
*** In the "Links" sections at the bottoms of each of the main CEQA "Project" pages, added a link to the list of [[CEQA projects on the Central Coast]] (if one was not already there)
 
* AO
 
* AO

Revision as of 13:41, 9 April 2015

This page is a working area for the ENVS 560 class.

Lists to keep up to date

Don't forget to make sure all major 'issue' and 'summary' pages are listed in one of these two lists:

Ideas for the future

Main new contribs 2015:

Minor new contribs 2015:

..

Updates worked on in 2015:

Links to pages students want Fred to look at soon

Links to what you mostly worked on (2015) and a very brief summary of what you did

Main new contribs 2014:

Minor new contribs 2014:

Updates worked on in 2014:

Leftover ideas after 2014:

  • Association of Environmental Professionals (AEP)
    • Who they are
    • What they do
    • Who are members
    • Student chapter
    • Recent events
  • PG Diversion project & DEIR
  • Hollister Hills - site summary
  • Page on all the water providers in the Monterey Bay Region - the biggies (like Cal Am), and all the teeny weird ones you never heard of (like Seaside Muni). Needs a good set of maps.
  • Other:
    • Water Supply for the Cal Am service area (focus on current impediments to the proposed portfolio approach)
    • Water metering as a means of understanding agricultural water use.
    • Understanding "water policy cycles"---Water supply and Policies that are viable in drought years, but untenable in years of plenty (new big dams in CA, etc).
    • Impacts of the new Salinas River channel maintenance program.
    • Movement toward public takeover of Cal Am water supply system.
    • Is there a physical inventory of extant groundwater resources to fuel existing (or proposed) Fort Ord reuse plans. This could be a close scrutiny of the Monterey Downs EIR.
    • How does the planned desal impact Fort Ord reuse?
    • Potential water use projects that would secure the now tenuous MCWRA rights to about 168,000 af/yr of Salinas Valley water.
    • When new subdivisions are permitted, they must demonstrate a sustainable water supply. Apparently, that approach is flawed, since many areas are in overdraft. What are the minimum criteria for demonstrating "sustainable" water supply and why does it fail in many cases?

Leftover ideas after 2013:

  • CEQA
    • CEQA approaches to each of the main CEQA areas:
      • Visual / aesthetic
      • Transport
      • Wetlands
      • etc.
    • Firms that do CEQA, tabulated by project, role, specialty, client etc.
  • Land use planning in Central Coast
    • County General Plan
    • County Long-Range Development Plan
    • Marina General Plan
    • Seaside General Plan
    • AMBAG Metropolitan Transportation Plan
    • TAMC Regional Transportation Plan
    • Former CA-led County Redevelopment Agencies and new 'Successor' agencies.
    • Fort Ord
      • BRAC / Fort Ord Cleanup
      • History of consistency determinations made with respect to Fort Ord Reuse Plan
  • Viewshed policy (county critical viewshed, approaches taken in CEQA projects)
  • Water rights - How do water rights work?
    • e.g. for projects in CEQA right now (Ferrini, Downs)
  • Drainage studies
    • e.g. Canyon del Rey and current contract to Balance & Whitson
  • Ag Waiver & TMDLs:
    • Can always use more updating with new developments
  • Stakeholder pages:
    • Marina Coast Water District, e.g. its role in Fort Ord re-use
    • MPWMD, e.g. its role in Canyon del Rey drainage study update
    • TAMC
    • AMBAG
  • Specific Watersheds
  • Wildlife:
    • Wildlife habitat corridor planning - State-level efforts, Regional effort led by CalTrans, Local survey led by BSLT, ...

Disclaimer

This page may contain student's work completed as part of assigned coursework. It may not be accurate. It does not necessarily reflect the opinion or policy of CSUMB, its staff, or students.