Difference between revisions of "File:GabilanWatershed FlowDurationAnalysis.png"

From CCoWS Wiki
Jump to: navigation, search
(Created in Excel using USGS data by Fred Watson as an example to ENVS 560 class.)
 
 
Line 1: Line 1:
Created in Excel using USGS data by Fred Watson as an example to ENVS 560 class.
+
== Metadata ==
 +
 
 +
* Created in Excel using daily USGS flow data by [[Fred Watson]] as an example to ENVS 560 class.
 +
* Probable flaw: From memory, the flow records used for this analysis did not exactly match in time, so the comparison is biased by inter-annual variations in climate in watershed characteristics.

Latest revision as of 15:07, 20 February 2009

Metadata

  • Created in Excel using daily USGS flow data by Fred Watson as an example to ENVS 560 class.
  • Probable flaw: From memory, the flow records used for this analysis did not exactly match in time, so the comparison is biased by inter-annual variations in climate in watershed characteristics.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:05, 20 February 2009Thumbnail for version as of 15:05, 20 February 2009900 × 639 (41 KB)Fred (Talk | contribs)Created in Excel using USGS data by Fred Watson as an example to ENVS 560 class.
  • You cannot overwrite this file.

The following page links to this file: