Difference between revisions of "Fort Ord Dunes State Park Campground Project"

From CCoWS Wiki
Jump to: navigation, search
(References=)
(Environmental Impact Report)
 
(6 intermediate revisions by 3 users not shown)
Line 2: Line 2:
 
990 acres including 4 miles of beach front.  The campground project site is 130 acres.<ref>[http://www.parks.ca.gov/pages/980/files/final%20fodsp%20draft_is_mnd%203_15_2013.pdf] Draft initial study</ref>
 
990 acres including 4 miles of beach front.  The campground project site is 130 acres.<ref>[http://www.parks.ca.gov/pages/980/files/final%20fodsp%20draft_is_mnd%203_15_2013.pdf] Draft initial study</ref>
 
==Background==
 
==Background==
The site was used by the army for small arms training.  Toxic soils found on firing ranges underwent remediation and remediated sites were restored with native vegetation.  Where remediation did not occur, non-native iceplant is the predominant ground cover.  The campground site is located near storage bunkers and extensive paved areas.   
+
The site was used by the army for small arms training.  Toxic soils found on firing ranges underwent remediation and remediated sites were restored with native vegetation.  Where remediation did not occur, non-native iceplant is the predominant ground cover.  The campground site is located near storage bunkers and extensive paved areas.  <ref>[http://www.parks.ca.gov/pages/980/files/final%20fodsp%20draft_is_mnd%203_15_2013.pdf] Draft initial study</ref>
 +
 
 
==Environmental Impact Report==
 
==Environmental Impact Report==
California Department of Parks and Recreation adopted a general plan and a "programmatic" EIR Fort Ord Dunes State Park in 2004.  Parks recently released an initial study/mitigated negative declaration specific to the campground project.  The use of a "programmatic" EIR allowed Parks to use a "tiered" analysis of impacts as the scope of project components narrow.  The campground project is a narrower scope than the entire park general plan, and mitigation measures in the Campground initial study include references to mitigation measures analyzed in the general plan.
+
[[California Department of Parks and Recreation]] adopted a general plan and a "programmatic" [http://www.ceqanet.ca.gov/ProjDocList.asp?ProjectPK=622963 EIR Fort Ord Dunes State Park] in 2004.  Parks recently released an initial study/mitigated negative declaration specific to the campground project.  The use of a "programmatic" EIR allowed Parks to use a "tiered" analysis of impacts as the scope of project components narrow.  The campground project is a narrower scope than the entire park general plan, and mitigation measures in the Campground initial study include references to mitigation measures analyzed in the general plan.<ref>[http://www.parks.ca.gov/pages/980/files/final%20fodsp%20draft_is_mnd%203_15_2013.pdf] Draft initial study</ref>
 +
 
 
==Initial Study==
 
==Initial Study==
The campground project is consistent with the 1997 Base Reuse Plan created by the Fort Ord Reuse Authority, when the park was designated as open space encompassing a variety of uses including camping.  The project includes 45 RV sites, parking for 80 vehicles, four restroom/shower buildings, a multi-purpose building, outdoor facilities, restoration of one or more bunkers, an entrance station , three modular operations structures and a trail network.
+
The campground project is consistent with the 1997 Base Reuse Plan created by the Fort Ord Reuse Authority, when the park was designated as open space encompassing a variety of uses including camping.  The project includes 45 RV sites, parking for 80 vehicles, four restroom/shower buildings, a multi-purpose building, outdoor facilities, restoration of one or more bunkers, an entrance station , three modular operations structures and a trail network.<ref>[http://www.parks.ca.gov/pages/980/files/final%20fodsp%20draft_is_mnd%203_15_2013.pdf] Draft initial study</ref>
=References=
+
 
 +
==References==
 
<references/>
 
<references/>
 
==Links==
 
==Links==
Line 13: Line 16:
 
*[[CEQA review and land use planning]]
 
*[[CEQA review and land use planning]]
 
*[[CEQA projects on Central Coast]]
 
*[[CEQA projects on Central Coast]]
 +
*[http://www.ceqanet.ca.gov/ProjDocList.asp?ProjectPK=622963 CEQAnet Project Description SCH Number 2013031053]
 +
 +
== Disclaimer ==
 +
 +
This page may contain student work completed as part of assigned coursework. It may not be accurate. It does not necessary reflect the opinion or policy of [[CSUMB]], its staff, or students.

Latest revision as of 22:42, 28 March 2017

Fort Ord Dunes State Park is located within the former Fort Ord Army Base. The Park is approximately 990 acres including 4 miles of beach front. The campground project site is 130 acres.[1]

Background

The site was used by the army for small arms training. Toxic soils found on firing ranges underwent remediation and remediated sites were restored with native vegetation. Where remediation did not occur, non-native iceplant is the predominant ground cover. The campground site is located near storage bunkers and extensive paved areas. [2]

Environmental Impact Report

California Department of Parks and Recreation adopted a general plan and a "programmatic" EIR Fort Ord Dunes State Park in 2004. Parks recently released an initial study/mitigated negative declaration specific to the campground project. The use of a "programmatic" EIR allowed Parks to use a "tiered" analysis of impacts as the scope of project components narrow. The campground project is a narrower scope than the entire park general plan, and mitigation measures in the Campground initial study include references to mitigation measures analyzed in the general plan.[3]

Initial Study

The campground project is consistent with the 1997 Base Reuse Plan created by the Fort Ord Reuse Authority, when the park was designated as open space encompassing a variety of uses including camping. The project includes 45 RV sites, parking for 80 vehicles, four restroom/shower buildings, a multi-purpose building, outdoor facilities, restoration of one or more bunkers, an entrance station , three modular operations structures and a trail network.[4]

References

  1. [1] Draft initial study
  2. [2] Draft initial study
  3. [3] Draft initial study
  4. [4] Draft initial study

Links

Disclaimer

This page may contain student work completed as part of assigned coursework. It may not be accurate. It does not necessary reflect the opinion or policy of CSUMB, its staff, or students.