Difference between revisions of "Monterey One Water"

From CCoWS Wiki
Jump to: navigation, search
(Projects and Facilities)
(Projects and Facilities)
Line 7: Line 7:
 
=Projects and Facilities=
 
=Projects and Facilities=
 
*[[Pure Water Monterey Groundwater Replenishment]]
 
*[[Pure Water Monterey Groundwater Replenishment]]
*[[Wastewater Conveyance]]
 
 
*[[Power Generation]]
 
*[[Power Generation]]
 
*[[Castroville Seawater Intrusion Project]]
 
*[[Castroville Seawater Intrusion Project]]

Revision as of 18:54, 3 April 2018

History

Monterey One Water[1], formerly known as the Move Monterey Regional Water Pollution Control Agency (MRWPCA), was established in

Water Treatment Process

Projects and Facilities

Public Engagement

Summary

MRWPCA was established in 1979 to administer water rationing in response to severe drought conditions [2]. MRWPCA was formed under a Joint Powers Authority agreement between the City of Monterey, the City of Pacific Grove and the Seaside County Sanitation District as a peninsula-wide effort to resolve area’s water issues [3]. MRWPCA operates the Regional Treatment Plant, the Salinas River Diversion Facility, the Castroville Seawater Intrusion Project, sewage collection pipelines, and 25 wastewater pump stations [3].

References

  1. Monterey One Water Homepage http://montereyonewater.org/
  2. http://www.mrwpca.org/recycling/
  3. 3.0 3.1 http://www.mpwaterreplenishment.org/docs/Final%20GWR%20NOP%2030May2013%20with%20figures.pdf

Links

Disclaimer

This page may contain students' work completed as part of assigned coursework. It may not be accurate. It does not necessarily reflect the opinion or policy of CSUMB, its staff, or students.