Difference between revisions of "Monterey Peninsula Water Project"

From CCoWS Wiki
Jump to: navigation, search
(Overview)
(Costs)
Line 5: Line 5:
  
 
==Costs==
 
==Costs==
The MPWP has an estimated cost of $277 million<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref>.  These costs will be allocated to subsurface intake systems and supply return facilities($51M), a desalination plant ($95M), pipeline facilities ($131M), and    pre-construction costs ($8M)
+
The MPWP has an estimated cost of $277 million<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref>.  These costs will be allocated to following portions of the project:
 +
 
 +
 
 +
{| border="1" class="wikitable"
 +
 
 +
! scope="col"|Aspect of MPWP
 +
! scope="col"|Cost
 +
 
 +
 
 +
|-
 +
 
 +
|Surface Intake Systems and Supply Return Facilities||$51M
 +
|-
 +
|Desalination Plant||$95M
 +
|-
 +
|Pipeline Facilities||$131M
 +
|-
 +
|Pre-Construction Cost||$8M
 +
|-
 +
 
 +
|}
  
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 22:10, 1 April 2015

Overview

The Monterey Peninsula Water Project (MPWP) will consist of a series of slant wells[1] designed to pump water to a desalination facility in Marina. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water...


Costs

The MPWP has an estimated cost of $277 million[1]. These costs will be allocated to following portions of the project:


Aspect of MPWP Cost


Surface Intake Systems and Supply Return Facilities $51M
Desalination Plant $95M
Pipeline Facilities $131M
Pre-Construction Cost $8M

References

  1. 1.0 1.1 http://www.watersupplyproject.org/overview