Difference between revisions of "Monterey Peninsula Water Project"

From CCoWS Wiki
Jump to: navigation, search
(Costs)
(Overview)
Line 1: Line 1:
 
==Overview==
 
==Overview==
  
The Monterey Peninsula Water Project (MPWP) will consist of a series of [[slant wells]]<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref> designed to pump water to a desalination facility in Marina.  Current water (% use) in Monterey County stems from water which has been illegal obtained (citation).  This project will prevent the legality problem of water...  
+
The Monterey Peninsula Water Project (MPWP) will consist of a series of [[slant wells]]designed to pump water to a desalination facility in Marina <ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref>.  Current water (% use) in Monterey County stems from water which has been illegal obtained (citation).  This project will prevent the legality problem of water...
 
+
  
 
==Costs==
 
==Costs==

Revision as of 22:21, 1 April 2015

Overview

The Monterey Peninsula Water Project (MPWP) will consist of a series of slant wellsdesigned to pump water to a desalination facility in Marina [1]. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water...

Costs

The MPWP has an estimated cost of $277 million[1]. These costs will be allocated to following portions of the project:


Aspect of MPWP Cost


Surface Intake Systems and Supply Return Facilities $51M
Desalination Plant $95M
Pipeline Facilities $131M
Pre-Construction Cost $8M

References

  1. 1.0 1.1 http://www.watersupplyproject.org/overview