Difference between revisions of "Monterey Peninsula Water Project"
From CCoWS Wiki
(→Costs) |
(→Overview) |
||
Line 1: | Line 1: | ||
==Overview== | ==Overview== | ||
− | The Monterey Peninsula Water Project (MPWP) will consist of a series of [[slant wells]]<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref> | + | The Monterey Peninsula Water Project (MPWP) will consist of a series of [[slant wells]]designed to pump water to a desalination facility in Marina <ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref>. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water... |
− | + | ||
==Costs== | ==Costs== |
Revision as of 22:21, 1 April 2015
Overview
The Monterey Peninsula Water Project (MPWP) will consist of a series of slant wellsdesigned to pump water to a desalination facility in Marina [1]. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water...
Costs
The MPWP has an estimated cost of $277 million[1]. These costs will be allocated to following portions of the project:
Aspect of MPWP | Cost
|
---|---|
Surface Intake Systems and Supply Return Facilities | $51M |
Desalination Plant | $95M |
Pipeline Facilities | $131M |
Pre-Construction Cost | $8M |