Difference between revisions of "Monterey Peninsula Water Project"
From CCoWS Wiki
(Created page with "==Overview== The Monterey Peninsula Water Project will consist of a series of slant wells<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref> de...") |
(→Overview) |
||
Line 1: | Line 1: | ||
==Overview== | ==Overview== | ||
− | The Monterey Peninsula Water Project will consist of a series of [[slant wells]]<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref> designed to pump water to a desalination facility in Marina. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water... | + | The Monterey Peninsula Water Project (MPWP) will consist of a series of [[slant wells]]<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref> designed to pump water to a desalination facility in Marina. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water... |
− | == | + | |
+ | |||
+ | ==Costs== | ||
+ | The MPWP has an estimated cost of $277 million<ref name="Project Overview"> http://www.watersupplyproject.org/overview</ref>. These costs will be allocated to subsurface intake systems and supply return facilities($51M), a desalination plant ($95M), pipeline facilities ($131M), and pre-construction costs ($8M) | ||
==References== | ==References== | ||
<references/> | <references/> |
Revision as of 19:29, 30 March 2015
Overview
The Monterey Peninsula Water Project (MPWP) will consist of a series of slant wells[1] designed to pump water to a desalination facility in Marina. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water...
Costs
The MPWP has an estimated cost of $277 million[1]. These costs will be allocated to subsurface intake systems and supply return facilities($51M), a desalination plant ($95M), pipeline facilities ($131M), and pre-construction costs ($8M)