Monterey Peninsula Water Project

From CCoWS Wiki
Revision as of 22:21, 1 April 2015 by Danm (Talk | contribs)

Jump to: navigation, search

Overview

The Monterey Peninsula Water Project (MPWP) will consist of a series of slant wellsdesigned to pump water to a desalination facility in Marina [1]. Current water (% use) in Monterey County stems from water which has been illegal obtained (citation). This project will prevent the legality problem of water...

Costs

The MPWP has an estimated cost of $277 million[1]. These costs will be allocated to following portions of the project:


Aspect of MPWP Cost


Surface Intake Systems and Supply Return Facilities $51M
Desalination Plant $95M
Pipeline Facilities $131M
Pre-Construction Cost $8M

References

  1. 1.0 1.1 http://www.watersupplyproject.org/overview