Difference between revisions of "Monterey Peninsula Water Supply Project (MPWSP)"

From CCoWS Wiki
Jump to: navigation, search
(Timeline)
(Links)
Line 43: Line 43:
 
* [http://www.watersupplyproject.org/ MPWSP home page]
 
* [http://www.watersupplyproject.org/ MPWSP home page]
 
* [http://www.cpuc.ca.gov/Environment/info/esa/mpwsp/index.html MPWSP page at CPUC site]
 
* [http://www.cpuc.ca.gov/Environment/info/esa/mpwsp/index.html MPWSP page at CPUC site]
 +
 +
==References==
 +
<references/>
  
 
== Disclaimer ==
 
== Disclaimer ==
  
 
This page may contain student work completed as part of assigned coursework. It may not be accurate. It does not necessary reflect the opinion or policy of [http://csumb.edu CSUMB], its staff, or students.
 
This page may contain student work completed as part of assigned coursework. It may not be accurate. It does not necessary reflect the opinion or policy of [http://csumb.edu CSUMB], its staff, or students.

Revision as of 12:07, 2 April 2015

Project Summary

Costs

The MPWP has an estimated cost of $277 million[1]. These costs will be allocated to following portions of the project:


Aspect of MPWP Cost


Surface Intake Systems and Supply Return Facilities $51M
Desalination Plant $95M
Pipeline Facilities $131M
Pre-Construction Cost $8M

Rate Changes

With the installation of the Marina Peninsula Water Project, typical rate payers in the Monterey area can expect a 41% bill increase by 2018 [2]. The average citizen in the Monterey area uses approximately 74 units (10 cubic feet per unit). These citizens monthly bill is expected to raise from $75 to an estimated $104 by 2018. Citizens will be affected differently based on the levels of their water consumption.

Current Status

Timeline

  • April 12, 2011
    • Investigation begins into the Regional Water Project, ultimately leading to that projects failure
  • April 23, 2012
    • CalAM filed an application with the California Public Utilities Commission leading to the creation of the MPWP
  • January 30, 2014
    • Reached the final depth of the slant well testing its feasibility for the MPWP water source[3]
  • March 30, 2014
    • Completed test slant well successfully began pumping water and returning it to the ocean[4]

Links

References

  1. http://www.watersupplyproject.org/overview
  2. http://www.amwater.com/caaw/Customer-Service/Rates-Information/monterey-water-supply-project.html
  3. http://www.montereyherald.com/opinion/20150227/ian-crooks-cal-am-test-slant-well-to-deliver-key-data
  4. http://www.ksbw.com/news/Cal-Am-desalination-well-now-pumping-water/32092494