(Timeline)
(Timeline)
Line 33: Line 33:
 
**Investigation begins into the Regional Water Project, ultimately leading to that projects failure
 
**Investigation begins into the Regional Water Project, ultimately leading to that projects failure
 
*'''April 23, 2012'''
 
*'''April 23, 2012'''
**[[CalAM]] filed an application with the California Public Utilities Commission leading to the creation of the MPWP
+
**[[California American Water Company (CalAm)|CalAm]] filed an application with the California Public Utilities Commission leading to the creation of the MPWP
 
*'''October 10, 2012
 
*'''October 10, 2012
**Notice of Preparition of the project's [[EIR]] was released<ref name="Project CEQA"> http://www.cpuc.ca.gov/Environment/info/esa/mpwsp/index.html</ref>  
+
**Notice of Preparition of the project's [[Environmental Impact Report (EIR)|EIR]] was released<ref name="Project CEQA"> http://www.cpuc.ca.gov/Environment/info/esa/mpwsp/index.html</ref>  
 
*'''January 30, 2014'''
 
*'''January 30, 2014'''
 
**Reached the final depth of the slant well testing its feasibility for the MPWP water source<ref name="Test Well"> http://www.montereyherald.com/opinion/20150227/ian-crooks-cal-am-test-slant-well-to-deliver-key-data</ref>
 
**Reached the final depth of the slant well testing its feasibility for the MPWP water source<ref name="Test Well"> http://www.montereyherald.com/opinion/20150227/ian-crooks-cal-am-test-slant-well-to-deliver-key-data</ref>
Line 41: Line 41:
 
**Completed test slant well successfully began pumping water and returning it to the ocean<ref name="KSBW"> http://www.ksbw.com/news/Cal-Am-desalination-well-now-pumping-water/32092494</ref>
 
**Completed test slant well successfully began pumping water and returning it to the ocean<ref name="KSBW"> http://www.ksbw.com/news/Cal-Am-desalination-well-now-pumping-water/32092494</ref>
 
*'''April 2015'''
 
*'''April 2015'''
**Draft of the EIR is scheduled for release
+
**Draft of the EIR is scheduled for release<ref name="Project CEQA"> http://www.cpuc.ca.gov/Environment/info/esa/mpwsp/index.html</ref>
 
*'''October 2015'''
 
*'''October 2015'''
**Publication of the final EIR is scheduled for release
+
**Publication of the final EIR is scheduled for release<ref name="Project CEQA"> http://www.cpuc.ca.gov/Environment/info/esa/mpwsp/index.html</ref>
  
 
==Links==
 
==Links==

Revision as of 12:55, 2 April 2015

Project Summary

Costs

The MPWP has an estimated cost of $277 million[1]. These costs will be allocated to following portions of the project:


Aspect of MPWP Cost


Surface Intake Systems and Supply Return Facilities $51M
Desalination Plant $95M
Pipeline Facilities $131M
Pre-Construction Cost $8M

Rate Changes

With the installation of the Marina Peninsula Water Project, typical rate payers in the Monterey area can expect a 41% bill increase by 2018 [2]. The average citizen in the Monterey area uses approximately 74 units (10 cubic feet per unit). These citizens monthly bill is expected to raise from $75 to an estimated $104 by 2018. Citizens will be affected differently based on the levels of their water consumption.

Current Status

Timeline

  • April 12, 2011
    • Investigation begins into the Regional Water Project, ultimately leading to that projects failure
  • April 23, 2012
    • CalAm filed an application with the California Public Utilities Commission leading to the creation of the MPWP
  • October 10, 2012
    • Notice of Preparition of the project's EIR was released[3]
  • January 30, 2014
    • Reached the final depth of the slant well testing its feasibility for the MPWP water source[4]
  • March 30, 2014
    • Completed test slant well successfully began pumping water and returning it to the ocean[5]
  • April 2015
    • Draft of the EIR is scheduled for release[3]
  • October 2015
    • Publication of the final EIR is scheduled for release[3]

Links

References

  1. http://www.watersupplyproject.org/overview
  2. http://www.amwater.com/caaw/Customer-Service/Rates-Information/monterey-water-supply-project.html
  3. 3.0 3.1 3.2 http://www.cpuc.ca.gov/Environment/info/esa/mpwsp/index.html
  4. http://www.montereyherald.com/opinion/20150227/ian-crooks-cal-am-test-slant-well-to-deliver-key-data