Difference between revisions of "Nacimiento Dam"

From CCoWS Wiki
Jump to: navigation, search
(Created page with "Image 1. Nacimiento Dam. A Environmental Topics summar...")
 
Line 1: Line 1:
 
[[Image:NacimientoDam.JPG|300px|thumb|right|Image 1. Nacimiento Dam.]]
 
[[Image:NacimientoDam.JPG|300px|thumb|right|Image 1. Nacimiento Dam.]]
 
A [[Summaries of Environmental Topics in California's Central Coast Region|Environmental Topics]] summary by the [[ENVS 560/L Watershed Systems]] class at [[California State University Monterey Bay|CSUMB]].
 
A [[Summaries of Environmental Topics in California's Central Coast Region|Environmental Topics]] summary by the [[ENVS 560/L Watershed Systems]] class at [[California State University Monterey Bay|CSUMB]].
 +
 +
The mission of this digital enclyopedia entry is to provide a brief overview of the Nacimiento Dam, a history of construction, its environmental impact, and post-construction monitoring efforts. This page is presented as a result of a collaborative effort between CSUMB students, faculty, and staff. The dam was completed in 1957 and is under the jurisdiction of the California Department of Water Resources.<ref name-"MCWRA">Monterey County Water Resources Agency. 2020. Dams And Reservoirs Overview. https://www.co.monterey.ca.us/government/government-links/water-resources-agency/projects-facilities/dams-and-reservoirs/</ref>

Revision as of 22:42, 5 April 2020

Image 1. Nacimiento Dam.

A Environmental Topics summary by the ENVS 560/L Watershed Systems class at CSUMB.

The mission of this digital enclyopedia entry is to provide a brief overview of the Nacimiento Dam, a history of construction, its environmental impact, and post-construction monitoring efforts. This page is presented as a result of a collaborative effort between CSUMB students, faculty, and staff. The dam was completed in 1957 and is under the jurisdiction of the California Department of Water Resources.[1]
Cite error: <ref> tags exist, but no <references/> tag was found