Difference between revisions of "Regional Treatment Plant (RTP)"

From CCoWS Wiki
Jump to: navigation, search
(Summary)
Line 1: Line 1:
 
==Summary==
 
==Summary==
New page. Not written yet.
+
The Regional Treatment Plant (RTP) was constructed two miles north of the [[City of Marina]]<ref name="About MRWPCA, Our History"> [http://www.mrwpca.org/about_history.php MRWPCA, About - Our History] </ref>. It began operation in 1990 with a design capacity of 29.6 million gallons per day (MGD), and was situated near farmland experiencing the most [[seawater intrusion]]. The construction costs were funded through both state and federal grants, and represent a sum total of $150M. The operation and maintenance costs for the RTP are paid for by property owners<ref name="About MRWPCA, Our History" />.
  
 
==Links==
 
==Links==

Revision as of 14:41, 8 April 2015

Summary

The Regional Treatment Plant (RTP) was constructed two miles north of the City of Marina[1]. It began operation in 1990 with a design capacity of 29.6 million gallons per day (MGD), and was situated near farmland experiencing the most seawater intrusion. The construction costs were funded through both state and federal grants, and represent a sum total of $150M. The operation and maintenance costs for the RTP are paid for by property owners[1].

Links

References

  1. 1.0 1.1 MRWPCA, About - Our History

Disclaimer

This page may contain student work completed as part of assigned coursework. It may not be accurate. It does not necessary reflect the opinion or policy of CSUMB, its staff, or students.