Difference between revisions of "Seaside Basin Aquifer Storage and Recovery (ASR)"

From CCoWS Wiki
Jump to: navigation, search
(Links)
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
An [[Summaries of Environmental Topics on the Central Coast of California|environmental summary]] created by the [[ENVS 560/L Watershed Systems]] class at [[CSUMB]].
 +
 
=Summary=
 
=Summary=
  
The Seaside Basin Aquifer and Storage Recovery (ASR) project takes water pumped from the [[Carmel River]] and injects it into the [[Seaside Groundwater Basin]].<ref name = "MPWMD ASR Phase 1"> [http://www.mpwmd.dst.ca.us/mapgallery/GwrPstr_Left_small.pdf MPWMD ASR Phase 1] </ref>  The Seaside Basin allows for an increase in storage capacity for Monterey Peninsula Residents during dry periods of time.<ref name = "MPWMD ASR Phase 1"> [http://www.mpwmd.dst.ca.us/mapgallery/GwrPstr_Left_small.pdf MPWMD ASR Phase 1] </ref>  Other benefits of ASR is that it decreases the overdraft issues within the Seaside Basin as well as limits the potential of Seawater intrusion. The ASR project is managed by the [[Monterey Peninsula Water Management District (MPWMD)]] and [[California American Water Company (CalAm)]]. In Phase 1 of the ASR two wells began operating at the Santa Margarita Site.<ref name = "MPWMD Seaside Basin ASR"> [http://www.watereuse.org/sites/default/files/u3/Dave%20Stoldt.pdf MPWMD Seaside Basin ASR] </ref> Phase 2 of the ASR included two wells near Seaside Middle School, which were completed in 2010.<ref name = "MPWMD Seaside Basin ASR"> [http://www.watereuse.org/sites/default/files/u3/Dave%20Stoldt.pdf MPWMD Seaside Basin ASR] </ref>  The estimated annual yield of the ASR is 1,920 AFY.<ref name = "GWR NOP"> [http://www.mpwaterreplenishment.org/docs/Final%20GWR%20NOP%2030May2013%20with%20figures.pdf GWR NOP] </ref>  
+
The Seaside Basin Aquifer and Storage Recovery (ASR) project takes water pumped from the [[Carmel River]] and injects it into the [[Seaside Groundwater Basin]].<ref name = "MPWMD ASR Phase 1"> [http://www.mpwmd.dst.ca.us/mapgallery/GwrPstr_Left_small.pdf MPWMD ASR Phase 1] </ref>  The Seaside Basin allows for an increase in storage capacity for Monterey Peninsula Residents during dry periods of time.<ref name = "MPWMD ASR Phase 1"/>. Other benefits of ASR is that it decreases the overdraft issues within the Seaside Basin as well as limits the potential of Seawater intrusion. The ASR project is managed by the [[Monterey Peninsula Water Management District (MPWMD)]] and [[California American Water Company (CalAm)]]. In Phase 1 of the ASR two wells began operating at the Santa Margarita Site.<ref name = "MPWMD Seaside Basin ASR"> [http://www.watereuse.org/sites/default/files/u3/Dave%20Stoldt.pdf MPWMD Seaside Basin ASR] </ref> Phase 2 of the ASR included two wells near Seaside Middle School, which were completed in 2010.<ref name = "MPWMD Seaside Basin ASR"> [http://www.watereuse.org/sites/default/files/u3/Dave%20Stoldt.pdf MPWMD Seaside Basin ASR] </ref>  The estimated annual yield of the ASR is 1,920 AFY.<ref name = "GWR NOP"> [http://www.mpwaterreplenishment.org/docs/Final%20GWR%20NOP%2030May2013%20with%20figures.pdf GWR NOP] </ref>  
  
 
=Links=
 
=Links=
 
*[[Monterey Peninsula Groundwater Replenishment Project]]
 
*[[Monterey Peninsula Groundwater Replenishment Project]]
 +
* [[CEQA projects on the Central Coast]]
 +
*[http://www.ceqanet.ca.gov/ProjDocList.asp?ProjectPK=624272 CEQAnet Project Description SCH 2013051094]
  
 
=References=
 
=References=

Latest revision as of 14:33, 27 March 2018

An environmental summary created by the ENVS 560/L Watershed Systems class at CSUMB.

Summary

The Seaside Basin Aquifer and Storage Recovery (ASR) project takes water pumped from the Carmel River and injects it into the Seaside Groundwater Basin.[1] The Seaside Basin allows for an increase in storage capacity for Monterey Peninsula Residents during dry periods of time.[1]. Other benefits of ASR is that it decreases the overdraft issues within the Seaside Basin as well as limits the potential of Seawater intrusion. The ASR project is managed by the Monterey Peninsula Water Management District (MPWMD) and California American Water Company (CalAm). In Phase 1 of the ASR two wells began operating at the Santa Margarita Site.[2] Phase 2 of the ASR included two wells near Seaside Middle School, which were completed in 2010.[2] The estimated annual yield of the ASR is 1,920 AFY.[3]

Links

References

  1. 1.0 1.1 MPWMD ASR Phase 1
  2. 2.0 2.1 MPWMD Seaside Basin ASR
  3. GWR NOP

Disclaimer

This page may contain student work completed as part of assigned coursework. It may not be accurate. It does not necessary reflect the opinion or policy of CSUMB, its staff, or students.