Difference between revisions of "Tarsier Tutorial: Adding GroundWater to Watershed Simulation"

From CCoWS Wiki
Jump to: navigation, search
Line 2: Line 2:
 
== Prerequisits ==
 
== Prerequisits ==
 
* Watershed analysis saved with all data
 
* Watershed analysis saved with all data
* Working Watershed simulation model
+
* Working Watershed simulation model (See [[Tarsier Tutorial: Watershed simulation using the Marmoset Model]])
 
== Adding aquifer Information to your Network Data ==
 
== Adding aquifer Information to your Network Data ==
 
* Open Aquifer Tab in Watershed Analysis tool
 
* Open Aquifer Tab in Watershed Analysis tool

Revision as of 12:51, 9 April 2010

  • This tutorial provides instructions on how to how a groundwater component to you Watershed Simulation Model.

Prerequisits

Adding aquifer Information to your Network Data

  • Open Aquifer Tab in Watershed Analysis tool
  • Click Calc Floodplain
    • Warning: Must have your Net Ptr, HydroDEM, and Stream Raster open in their usee controls.
    • This tool creates a raster covering your floodplain according to your set max flood height
    • Default max flood height it 1 meter. This should be estimated and changed to suit your watershed.
  • Click Calc Floodplain Area
    • Warning: Must have your Net Ptr, HydroDEM, and Stream Raster And your floodplain raster open in their usee controls.
    • This too breaks up your floodplain and connects a floodplain area with a corresponding node.
  • Click Calc Aquifer From Floodplain
    • Warning, must have your floodplain raster open, and have calculated floodplain area
    • This tool uses a hillslope parameter to estimate triangular aquifer geometry
    • The default hillslope is 15 degrees from horizontal, make a good estimation for your watershed.
    • Warning, a hillslope less then or equal to zero, or greater or equal to ninety will not work properly.

Including GroundWater processes in you Watershed Model

  • In Progress....