Water Supply Projects in California's Central Coast Region
From CCoWS Wiki
A watershed-related issue examined by the ENVS 560/L Watershed Systems class at CSUMB.
[1]Contents
Introduction
Two major issues for the Central Coast of California are water supply and water scarcity. The CalAm Use of Carmel River Groundwater Basin aims to resolve these major issues. This primary purpose of this page is to provide a partial list of water supply projects that have addressed these challenges.
Existing Water Supply Projects
The following list is taken from the MPWMD North Monterey County Drought Contingency Report. [2]
- Groundwater
- Recyled Water
- Surface Water
- Desalination
- Sand City, city located in Monterey County, California.
- Desalination
- Monterey Peninsula Water Supply Project (MPWSP) and Marina Coast Water District Desalination
Additional Links
- The Carmel River Watershed
- Carmel Valley Alluvial Aquifer
- CalAm Use of Carmel River Groundwater Basin
- Salinas River
References
- ↑ Salinas River. Geophysical Fluid Dynamics Laboratory photo: Salinas River Updated May 2008. Retrieved April 5, 2020.
- ↑ Monterey Peninsula Water Management District North Monterey County Drought Contingency Plan Published March 2019. Retrieved April 5, 2020.
Disclaimer
This page may contain student work completed as part of assigned coursework. It may not be accurate. It does not necessary reflect the opinion or policy of CSUMB, its staff, or students.