Difference between revisions of "Tarsier journal: Carmel Watershed"

From CCoWS Wiki
Jump to: navigation, search
Line 7: Line 7:
 
== Obtaining a DEM ==
 
== Obtaining a DEM ==
  
* Follow steps in [[Tarsier tutorial: Raster data]]
+
* Follow steps in [[Tarsier tutorial: Raster data]] and [[Tarsier tutorial: Raster resampler]]
 
** Select a 1/3" NED [[DEM]] i.e. about 10 meters.
 
** Select a 1/3" NED [[DEM]] i.e. about 10 meters.
 
** Select ''ArcGRID''
 
** Select ''ArcGRID''
Line 15: Line 15:
 
** Import ASCII data into Tarsier
 
** Import ASCII data into Tarsier
 
** Save as Tarsier raster (.tra)
 
** Save as Tarsier raster (.tra)
 +
** Convert raster from lat/long to UTM using raster resampler
 
  * These steps will soon be replaced by steps that can be fallowed in Tarsier only
 
  * These steps will soon be replaced by steps that can be fallowed in Tarsier only
  
 
== Creating a Visualization of the Watershed ==
 
== Creating a Visualization of the Watershed ==
* Fallow steps in [[Tarsier tutorial: Renderer]], [[Adding Agents]], [[Tarsier tutorial: Simple fly-through]] and [[Tarsier: Importing shapefiles]],
+
* Fallow steps in [[Tarsier tutorial: Renderer]], [[Adding Agents]], [[Tarsier tutorial: Simple fly-through]] and [[Tarsier: Importing shapefiles]]
 
   
 
   
  

Revision as of 12:02, 6 July 2009

This page is intended to record a journal of data processing and analysis steps take by various folks in the Carmel Watershed using Tarsier. Its half scratch-pad, and half-tutorial.

Goals

  • Get a watershed model up and running for the Carmel Watershed.

Obtaining a DEM

* These steps will soon be replaced by steps that can be fallowed in Tarsier only

Creating a Visualization of the Watershed


Links