Difference between revisions of "Summaries of Environmental Topics in California's Central Coast Region"

From CCoWS Wiki
Jump to: navigation, search
 
(One intermediate revision by one user not shown)
Line 4: Line 4:
  
 
* General:
 
* General:
** [[CEQA Overview]]
 
*** [[CEQA Glossary]]
 
*** [[CEQA review and land use planning]]
 
*** [[CEQA and California's Central Coast]]
 
 
** [[List of Environmental Consultants in the Central Coast Area]]
 
** [[List of Environmental Consultants in the Central Coast Area]]
 
** [[Common Permits Required for Restoration in the Central Coast Region]]
 
** [[Common Permits Required for Restoration in the Central Coast Region]]
 
*** [[Incidental Take Permits (ITPs)]]
 
*** [[Incidental Take Permits (ITPs)]]
** [[Clean Water Act]]
+
** [[Legislation related to environmental management in California's Central Coast Region]]
** [[Sustainable Groundwater Management Act (SGMA)]]
+
** [[California Endangered Species Act (CESA)]]
+
 
* Places:
 
* Places:
 
** [[Big Sur Region]]
 
** [[Big Sur Region]]
Line 27: Line 21:
 
** [[Santa Cruz Mountains]]
 
** [[Santa Cruz Mountains]]
 
** [[Sierra de Salinas Mountains]]
 
** [[Sierra de Salinas Mountains]]
 +
** [[ California Central Coast Gage Locations]]
 
* Hydrology:
 
* Hydrology:
 
**[[Urban stormwater regulations applicable to California's Central Coast region]]
 
**[[Urban stormwater regulations applicable to California's Central Coast region]]

Latest revision as of 12:12, 26 February 2021

Some of the environmental topics summarized in this wiki are listed below. By and large, these summaries are an outgrowth of the ENVS 560/L Watershed Systems class at CSUMB.

Refer also to the list of Watershed Issues on the Central Coast of California.

Links

Disclaimer

This page may contain students' work completed as part of assigned coursework. It may not be accurate. It does not necessarily reflect the opinion or policy of CSUMB, its staff, or students.